PLTGU Jawa 3 and PLTGU Sumbagut 1,3,4 800 MW   In an attempt to seize the opportunity to become an IPP developer of PLTGU Jawa-3 and Sumbagut 1,3,4 that have been listed in the RUPTL, PT Pembangkitan Jawa Bali (PJB) assigned reCOnsult to conduct the Feasibility Study of both PLTGU Jawa 3 and PLTGU Sumbagut 1,3,4. PT PLN (Persero) has since assigned PJB as the developer of the projects with majority shares in consortium with qualified partners. PLTGU Sumbagut 1,3,4 would be developed in 2on1 configuration, while PLTGU Jawa 3 would be developed in 1on1 configuration.

Client

 
PT Pembangkitan Jawa Bali  
   

Location

 

Services

East Java and North Sumatera   reCOnsult was appointed as Owner’s Engineer with the range of services including:
  • Feasibility Study
  • Electrical Grid and Interconnection Study
  • Site assessment
  • Selection of Configuration and capacity
  • Conceptual Design
  • Financial viability analysis
  • Environmental considerations
  • Bid Document Preparation
  • Technical Advisory prior to post PPA Proposal submission
  • Transmission route and ROW survey

Expertise

 
Owner's Engineer  

Years

 