PLTGU Jawa 3 and PLTGU Sumbagut 1,3,4 800 MW |
|
In an attempt to seize the opportunity to become an IPP developer of PLTGU Jawa-3 and Sumbagut 1,3,4 that have been listed in the RUPTL, PT Pembangkitan Jawa Bali (PJB) assigned reCOnsult to conduct the Feasibility Study of both PLTGU Jawa 3 and PLTGU Sumbagut 1,3,4. PT PLN (Persero) has since assigned PJB as the developer of the projects with majority shares in consortium with qualified partners. PLTGU Sumbagut 1,3,4 would be developed in 2on1 configuration, while PLTGU Jawa 3 would be developed in 1on1 configuration. |